The front steps and patio have been framed and are ready for concrete to be delivered, which should be Monday. We put the sod back around the outside of the patio frame.
As for the garage, the back and sides have been stripped and sanded and are ready to be primed. Next up is the front, which includes replacing the trim boards.
No comments:
Post a Comment